Antea Group tackled these 2 issues in the following manner:
Resolving groundwater flow patterns between the two sites:
Antea Group addressed DEP questions regarding groundwater flow on a more localized scale than had been attempted previously. These questions were addressed through a detailed analysis of historical water table elevation data and showed that there was a possibility of groundwater flow from the upgradient site to the client site.
Demonstrating that the MTBE on the two sites had a common origin:
Key elements of this concern included contaminant dilution, dispersion, and biodegradation. Antea Group collected and analyzed groundwater samples for compound-specific stable isotope ratio analysis (CSIRA). The results of this analysis showed that all collected samples exhibited similar carbon isotope ratios with a lack of fractionation. This led to the conclusion that the MTBE both on and offsite was not biodegrading and may have had a common source.